Hard Rock Las Vegas Files Plans for Three Distinct Entertainment Venues at the Former Mirage Property
Theo Krause · Aug 17, 2026

Hard Rock Las Vegas Files Plans for Three Distinct Entertainment Venues at the Former Mirage Property

Hard Rock Las Vegas has submitted development filings that outline three separate entertainment venues as part of the ongoing transformation of the former Mirage resort on the Las Vegas Strip, and these spaces form an integrated component of the larger Guitar Hotel project that carries a targeted opening date in late 2027.
The filings, submitted to Clark County, describe a 2,000-seat West Theater arena, a 5,000-seat Hard Rock Live venue, and the repurposing of the original Mirage Theater for smaller-scale performances, while the Paradise Town Advisory Board and the Clark County Commission are scheduled to conduct reviews of the proposals in the coming weeks.
Breakdown of the Planned Venues
Each venue serves a different audience segment and performance scale, with the 2,000-seat West Theater arena positioned to host arena-style concerts and events that require a mid-sized footprint, the 5,000-seat Hard Rock Live venue designed as the primary large-scale concert hall within the resort complex, and the former Mirage Theater adapted for intimate shows that typically draw fewer than 1,000 attendees per performance.
County documents indicate that the venues will operate under unified management yet maintain distinct entrances, staging areas, and technical specifications that allow simultaneous programming without operational overlap, and the overall layout ties directly into the Guitar Hotel structure so that hotel guests can access all three spaces through internal walkways and common areas.
Integration with the Guitar Hotel Redevelopment
The three entertainment spaces sit within the broader Guitar Hotel project that replaces the Mirage's iconic volcano and central tower elements with a new guitar-shaped hotel tower and expanded casino floor, and the filings show that construction sequencing places the venues on a parallel timeline with the main resort build-out so that all components reach substantial completion by the same late-2027 target date.
Site plans submitted to Clark County illustrate how the West Theater arena occupies space on the western edge of the property, the Hard Rock Live venue anchors the central entertainment corridor, and the repurposed Mirage Theater remains in its original location but receives updated seating, lighting, and sound systems that align with Hard Rock branding standards.

Regulatory Path and Upcoming Reviews
Clark County records show that the project team submitted detailed architectural drawings, traffic studies, and noise mitigation plans along with the venue specifications, and these materials now move forward to the Paradise Town Advisory Board for initial public comment before advancing to the Clark County Commission for final zoning and building approvals.
The filings reference no changes to the overall height or footprint of the Guitar Hotel tower itself, focusing instead on interior layout adjustments that accommodate the three performance spaces while preserving the required setbacks and parking allocations already approved in earlier phases of the redevelopment.
Construction Timeline Considerations
Project schedules listed in the county documents project that foundation work for the new venues will begin once the advisory board and commission complete their reviews, with structural steel erection targeted for the first half of 2026 and interior fit-out continuing through the middle of 2027 so that test events and staff training can occur before the full resort opens in late 2027.
Coordination with other Strip properties remains limited to standard traffic management during peak construction periods, and the filings note that the venues will connect to the existing pedestrian bridge network that links multiple resorts along the Strip corridor.
Conclusion
The Clark County filings therefore establish a clear framework for three distinct entertainment venues that will operate as core components of the Hard Rock Las Vegas Guitar Hotel when the property opens in late 2027, and the upcoming reviews by the Paradise Town Advisory Board and Clark County Commission represent the next required steps before construction can advance on the West Theater arena, the Hard Rock Live venue, and the repurposed Mirage Theater.